The authors take no responsibility for mistakes in their theses, but they would like readers to make them aware of obvious errors. Corrections can be sent to Per Tveit, HiA, N-4876 Grimstad, Norway. In due course, the errors in the graduation thesis will be corrected.
The work of Stefan Wendelin and Stephan Teich are on a road bridge spanning 135 m. It is in German.
The work of Uwe Steinmann is on a double track railway bridge spanning 100 m. It is in German.
Benjamin Brunn and Frank Schanack have improved on the bridge in Steimann's thesis. Their work is in English.
The work of Räck is on a combined road and railway network arch bridge spanning 160 m. It is in German.
Grimstad 05.03.04 Per Tveit
Diplomarbeit von Stephan Teich und Stefan Wendelin (2001)
Thema: Vergleichsrechnung einer Netwerkbogenbrücke unter Einsatz des Europäischen Normenkonzeptes
Graduation thesis on network arches
Diplomarbeit von Uwe Steimann (2002)
Graduation thesis on a railway network arch
Diplomarbeit von Brunn and Schanack (2003)
Graduation thesis on Network Arches
Graduation thesis of Mathias Räck (2003)
Entwurf einer kombinierten Straßen-Eisenbahn Netzwerkbogenbrücke